Pictures -- Build Log

Previous (Parts Gallery)
Home
Next (Tests)
Click on a picture to go to the day's report
Report 57:
07.03.2006

Progress:
New wheels and power switch.

Time:
7 hours

Report 56:
04.24.2006

Progress:
Stripped down and plated.

Time:
15 hours

Report 55:
07.11.2005

Progress:
Fixed uMOB2 height issues, rebuilt laptop battery pack, fabricated new Lexan top plates

Time:
22 hours

Report 54:
06.20.2005

Progress:
Mounted uMOB2, new VIA box shock mounts (iteration 1 and 2), two new top panel members

Time:
11 hours

Report 53:
06.14.2005

Progress:
Constructed static tensioner arms, repaired tracks

Time:
4 hours

Report 52:
05.24.2005

Progress:
A lot of work on the PWM interface, not a lot of results

Time:
27 hours

Report 51:
05.19.2005

Progress:
Built and tested the PWM coprocessor board

Time:
7 hours

Report 50:
05.16.2005

Progress:
Shock mounted and wired the new speed controllers.

Time:
8 hours

Report 49:
05.10.2005

Progress:
Stapled track, made new tensioner bars and speed controller mounts. Cut allowances in the top panel for the new controllers.

Time:
4 hours

Day 48:
04.07.2005

Progress:
Finished final assembly.

Time:
8 hours

Status:
I think we made it.

Day 47:
04.05.2005

Progress:
Installed track and computer system.

Time:
8 hours

Status:
We'll make it, provided the controller gets here Thursday morning

Day 46:
04.02.2005

Progress:
Ground drive axles to fit, did some wiring.

Time:
5 hours

Status:
Behind schedule, but I should be ready by Friday

Day 45:
03.31.2005

Progress:
Rebuilt drive axles, modified tensioner arm, un-wired the smoked controller.

Time:
10 hours

Status:
Behind schedule, ten days

Day 44:
03.26.2005

Progress:
Fixed drive sprockets, major test, broke drive sprockets, many hours of diagnosis, discovered cooked speed controller.

Time:
19 hours

Status:
Behind schedule, ten days

Day 43:
03.24.2005

Progress:
Computer wiring, finished track seams, installed tracks, cooked the serial cable, figured out that we cooked the serial cable.

Time:
17 hours

Status:
Behind schedule, ten days

Day 42:
03.22.2005

Progress:
Sewed other track, glued. Finished heat exchanger. Designed a process for loading the track.

Time:
15 hours

Status:
Behind schedule, ten days

Day 41:
03.20.2005

Progress:
Bent all of the aluminum tubing for the heat exchanger, and manufactured most of the fittings. Cut Lexan panels for the top.

Time:
11 hours

Status:
Behind schedule, ten days

Day 40:
03.19.2005

Progress:
Sewed up one track. Shock mounted the VIA enclosure.

Time:
6 hours

Status:
Behind schedule, ten days

Day 39:
03.17.2005

Progress:
Glued track. Front axle done, tensioners done, battery mounts done.

Time:
9 hours

Status:
Behind schedule, ten days

Day 38:
03.15.2005

Progress:
Trimmed the paddles and glued the track. Built the tensioner arms.

Time:
7 hours

Status:
Behind schedule, ten days

Day 37:
03.13.2005

Progress:
Finished cutting the tracks. Cut half the paddles.

Time:
6 hours

Status:
Behind schedule, nine days

Day 36:
03.10.2005

Progress:
Lots of track work, but not done yet.

Time:
6 hours

Status:
Behind schedule, eight days

Day 35:
03.09.2005

Progress:
Tensioner arm pivot fitting drilling, VIA enclosure bolt hole drilling, gasket cut.

Time:
3 hours

Status:
Behind schedule, seven days

Day 34:
03.08.2005

Progress:
Two and a half of four track cuts.

Time:
3 hours

Status:
Behind schedule, seven days

Day 33:
03.06.2005

Progress:
Cleaned shop, finished spring mounts, started tensioner arms.

Time:
5 hours

Status:
Behind schedule, seven days

Day 32:
03.05.2005

Progress:
Finished drive axles.

Time:
6 hours

Status:
Behind schedule, seven days

Day 31:
03.04.2005

Progress:
Mostly manufactured nitrogen spring mounts. Fixed chop saw wiring.

Time:
2 hours

Status:
Behind schedule, seven days

Day 30:
03.03.2005

Progress:
None

Time:
6 hours

Status:
Behind schedule, seven days

Day 29:
03.01.2005

Progress:
Some cutting, some gluing. Finally got organized.

Time:
3 hours

Status:
Behind schedule, five days

Day 28:
02.27.2005

Progress:
Added final chassis member, mounted and wired 6V batteries, finished suspension, assembled, tested.

Time:
10 hours

Status:
Behind schedule, four days

Day 27:
02.24.2005

Progress:
Removed drive axles, manufactured and installed suspension and glides for two axles.

Time:
9 hours

Status:
Behind schedule

Day 26:
02.23.2005

Progress:
Finished all three ground axles

Time:
5 hours

Status:
Behind schedule

Day 25:
02.22.2005

Progress:
First major test -- successful. More VIA box gluing, cut and marked the track, burned chop-saw, checked electronics fit, sealed speed controller.

Time:
10 hours

Status:
Still behind schedule

Day 24:
02.21.2005

Progress:
Manufactured the axles and hard disk mounts. VIA box epoxy: round two.

Time:
7 hours

Status:
Still technically behind schedule

Day 23:
02.20.2005

Progress:
Cut all the plastic for the VIA enclosure, glued the bottom half.

Time:
5 hours

Status:
Behind schedule

Day 22:
02.19.2005

Progress:
Welded speed controller mounts and manufactured aft battery mount.

Time:
3 hours

Status:
Behind schedule

Day 21:
02.17.2005

Progress:
Wired major electrical system.

Time:
10 hours

Status:
Behind schedule

Day 20:
02.15.2005

Progress:
Finished major structure. Mounted motors and drive train. Cut and mounted roller chain.

Time:
7 hours

Status:
One day behind schedule

Day 19:
02.13.2005

Progress:
Fixed the motor fit problem (to the extent that I will be able to), made and installed five members.

Time:
3 hours

Status:
Behind schedule

Day 18:
02.12.2005

Progress:
Built motor mounts. Almost finished major structure in aft half of chassis.

Time:
9 hours

Status:
Cautiously pessimistic

Day 17:
02.10.2005

Progress:
Cut, shaped, and welded 13 members. Aligned drive axle supports, checked battery fit, discovered battery defect.

Time:
9 hours

Status:
Outlook not so good

Day 16:
02.08.2005

Progress:
Cut, drilled, shaped, brushed, aligned, and welded eight cross-members.

Time:
5 hours

Status:
A little worried

Day 15:
02.06.2005

Progress:
Ground welds, flipped over, welded, ground welds, welded back, welded supports, ground corners, drilled holes, bolted to side panels.

Time:
5 hours

Status:
Still a little worried, but feeling a bit better

Day 14:
02.05.2005

Progress:
Finished welding the back panel piece and welded the first side of the top panel.

Time:
3 hours

Status:
A little worried

Day 13:
02.03.2005

Progress:
Cut remaining members for top platform. Ground all 30 pieces to final fit.

Time:
6 hours

Status:
A little worried

Day 12:
02.01.2005

Progress:
Laminated template to table. Cut and brushed thirteen members.

Time:
2 hours

Status:
On schedule

Day 11:
01.31.2005

Progress:
Drew, cut, and folded all individual templates for top panel. Finished master template.

Time:
6 hours

Status:
On schedule

Day 10:
01.30.2005

Progress:
Ground welds, flipped over, welded, grounded, and brushed second side panel. Abuse tested. Patched up cracks and evaluated results.

Time:
4 hours

Status:
On schedule

Day 9:
01.29.2005

Progress:
Cleaned second side panel members, touched up fits, completed first side welding.

Time:
3 hours

Status:
On schedule

Day 8:
01.27.2005

Progress:
Finished first chassis side panel.

Time:
5 hours

Status:
On schedule

Day 7:
01.25.2005

Progress:
Welded roughly one third of one side panel.

Time:
2 hours

Status:
On schedule

Day 6:
01.23.2005

Progress:
Ground remaining pieces for both sides of the chassis. Drilled, welded, and tapped eight weld nuts for clamping. Aligned eight members for welding.

Time:
4 hours

Status:
On schedule

Day 5:
01.22.2005

Progress:
Ground 38 steel members to shape.

Time:
3 hours

Status:
On schedule

Day 4:
01.20.2005

Progress:
Welded eight weld nuts.

Time:
2 hours

Status:
On schedule

Day 3:
01.19.2005

Progress:
Drilled some holes. It took much longer than it should have. Reasonably happy with the result.

Time:
2 hours

Status:
On schedule

Day 2:
01.18.2005

Progress:
Cut all of the remaining steel for the chassis sides. Marked all pieces for final fitting.

Time:
4 hours

Status:
On schedule

Day 1:
01.17.2005

Progress:
Cut and cleaned most of the steel for one chassis structure plane. Marked pieces for final fitting.

Time:
5 hours

Status:
On schedule

Previous (Parts Gallery)
Home
Next (Tests)